Smith/Vass Home Renovation
The Problem: The kitchen was dysfunctional, the dormers were out of proportion and the entrance way was plain.The Solution: TDB remodeled the kitchen, built two dormer roofs and a new entrance with a portico.

3D Front Perspective Drawing |
|

Before Remodeling |
|

A new walkway was created using flagstone set in a random pattern, surrounded by a brick border. Note: The new gabled dormer roofs. |
|

New entrance way is protected with a new portico. |
|

3D Kitchen Design |
|

Outcome: A new custom kitchen. |
|

Another 3D Kitchen View |
|

Here's another view of the end result. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
There Are No Problems, Only Solutions
Tabor Design Build, Inc.
15740 Crabbs Branch Way
Rockville, MD 20855
301-417-6570
Fax: 301-417-6574
Click Here to Contact Us
© Copyright 1997-2008 Tabor Design Build, Inc.